Sizing a TDOA cluster to survive one satellite losing its clock
Emitter geolocation from a small satellite formation is a timing problem before it is an RF problem. Horizontal error scales as GDOP × c × σ_t, where σ_t is the residual time synchronisation error between nodes. That product decides whether the constellation degrades gracefully when a node misbehaves or keeps reporting fixes that are confidently wrong. The chain below runs from the clock budget to the error ellipse, and every number in it is an estimate to be replaced with your own oscillator and link data.
The error chain
Each satellite timestamps the intercepted burst against its own disciplined oscillator. Pairwise time differences define hyperboloids, and their intersection with the Earth ellipsoid gives the fix. The range difference error is c·σ_t, geometry multiplies it, and FDOA adds a velocity difference term that grows in weight as baselines shorten. Take σ_t = 20 ns as the allocated synchronisation budget (estimate), covering GNSS-disciplined timing, group delay calibration of the RF chain and correlator peak interpolation. The correlator share follows the Cramér-Rao bound on bandwidth and SNR, so a narrowband emitter will exhaust this budget long before the clocks do.
Where it breaks
The failure mode that matters is quiet: one node loses GNSS lock, its oscillator goes into holdover, and its timestamps drift linearly with frequency offset and quadratically with ageing. The node keeps producing clean correlation peaks, so nothing looks wrong at the payload level, and the solver folds the biased time differences into a tight ellipse in the wrong place. Detection has to come from redundancy. With three or more nodes and a reference emitter at a surveyed position, a chi-square test on the post-fit residuals isolates the drifting node. Spacecraft dependability and fault management standards such as the ECSS family push you to make that test an explicit FDIR function instead of leaving it to an analyst on the ground.
Running on two
Once the bad node is excluded, the surviving pair gives a single TDOA hyperbola plus FDOA from relative velocity, and the geometry gets much worse. With a degraded GDOP of around 6 (estimate), the 20 ns budget alone gives roughly 36 m of horizontal error (estimate). That is several times the healthy triad's figure, and ephemeris error has not been added yet. For interference hunting and spectrum enforcement, where the job is to send a ground team to the right district, this is still a working product, and accumulating FDOA over successive passes tightens it further. It is not good enough to attribute a single short burst, so the tasking system has to know which mode produced each fix.
The decision rule
Size the oscillator so its holdover drift over the longest gap between reference emitter calibrations stays inside σ_t, and if the mass or power budget won't allow that, have FDIR remove the node from TDOA automatically on loss of lock and keep it contributing only FDOA until the next calibration brings its timing back within budget.
Technical FAQ: Why not just fly a better oscillator on every node?
Because the holdover requirement scales with the calibration gap, not with the mission. A tighter oscillator costs mass, power and thermal stability on every satellite. Planning more reference emitters along the ground track often closes the same budget for less. The usual answer is a moderate oscillator combined with dense calibration and an automatic downgrade to FDOA.